Government Approved Test Centre GATC

Every nozzle, proved to the millilitre.

CalibraMet LLP verifies, adjusts and seals petrol and diesel dispensers at fuel outlets across India — and leaves you with the certificate an inspector will ask for.

Testing against traceable working standards, on your forecourt, without shutting the outlet for the day.

+25 mL −25 mL 0 5 LITRE standard measure
Permissible error at a fuel outlet: ±25 mL in 5 L. Each nozzle is run at high and low flow, repeated, and only sealed once every run sits inside the band.
  • Testing & verificationOn-site, per nozzle
  • Legal Metrology complianceAct 2009 & Rules 2011
  • Accuracy assuredTraceable standards
  • Instrumentation expertiseMeters, gauges, sensors
  • Government Approved Test CentreGATC recognised

What we calibrate at a fuel outlet

Dispensers are the whole business, and everything around them that decides whether a litre sold is a litre delivered.

Dispenser verification & stamping

Multi-product and single-product units tested nozzle by nozzle against a 5 L standard measure, then adjusted and sealed.

Every nozzle, high and low flow

Annual re-verification

Stamping validity is tracked for each unit and we come back before it lapses, so a due date never turns into a shutdown notice.

Reminders 45 days ahead

New outlet commissioning

Pre-commissioning checks on freshly installed dispensers so the first litre sold at a new site is already inside tolerance.

Before the first sale

Storage tank calibration charts

Dip-to-volume charts for underground and above-ground tanks, so stock reconciliation stops arguing with the dip rod.

Dip-to-volume tables

Flow meters & instrumentation

Bulk meters, pressure and temperature instruments checked and documented alongside the dispensers on the same visit.

One visit, one report set

Certificates & audit support

Verification certificates, test records and seal registers issued in a form your oil company and the department both accept.

Digital copies retained

How a verification visit runs

Four steps, usually inside a single working day for a standard four-dispenser outlet.

  1. Step 1

    Book the slot

    Share the outlet code, number of dispensing units and nozzles, and the dates that suit your sales pattern.

  2. Step 2

    Test on site

    Each nozzle is run into a 5 L standard measure, repeated at high and low flow, with readings recorded as they happen.

  3. Step 3

    Adjust and seal

    Units outside tolerance are corrected on the spot, then sealed with numbered security seals logged against the unit.

  4. Step 4

    Certify

    You receive the verification certificate and test record, and the next due date goes into our reminder register.

Nozzles stay out of service only for the minutes they are being tested, so the forecourt keeps selling while we work through the units.

Book a verification

Pan-India, outlet by outlet

Field teams operate out of regional bases so a highway outlet is not a three-day trip. Multi-state dealer networks are scheduled as one programme with one point of contact.

West
Maharashtra, Gujarat, Goa, Madhya Pradesh, Chhattisgarh
North
Delhi NCR, Uttar Pradesh, Rajasthan, Punjab, Haryana, Uttarakhand
South
Tamil Nadu, Karnataka, Telangana, Andhra Pradesh, Kerala
East
West Bengal, Odisha, Bihar, Jharkhand, Assam and the North-East
4 zonesRegional field bases across India
±25 mLPermissible error we test against, in 5 L
1 dayTypical turnaround for a four-unit outlet
45 daysAdvance notice before stamping lapses

Running a chain of outlets? Send the list once and we build a rolling calendar around each site's stamping validity, then report progress against it.

What being a GATC actually means for you

A Government Approved Test Centre is authorised to carry out verification work on behalf of the Legal Metrology department. In plain terms: the testing, adjustment and sealing your dispensers need can be done by us, on your forecourt, and the paperwork stands up.

Records are retained on our side too, so a lost certificate is a phone call rather than a fresh inspection.

  • Legal Metrology Act, 2009 — the statute governing weights, measures and their verification in India.
  • Legal Metrology (General) Rules, 2011 — the tolerances and test procedures applied to dispensing units.
  • Working standards — 5 L standard capacity measures with traceable calibration, checked on schedule.
  • Security seals — numbered, logged per unit, and reported to you with the certificate.
  • Test records — every run recorded, not just the passing one, so trends across visits stay visible.

Book a verification

Tell us where the outlet is and how many nozzles are on site. We will come back with a date and what it costs.

This demo form does not send anywhere yet — connect it to your inbox or CRM before the site goes live.

CORPORATE OFFICE
Plot No. 00, Sample Industrial Layout
Placeholder Road, Nagpur – 440000
Maharashtra, India
EMAIL
contact@example.com
PHONE
+91 00000 00000
+91 00000 00001
HOURS
Monday to Saturday, 9:30 am – 6:30 pm

Placeholder contact details. Swap in the real address, phone numbers and email before publishing.